OKC (405) 600-1022 • TULSA (918) 215-3312 info@miller-tippens.com

Collision Works

Summary

OKC, Portland: New construction of 18,000 SF building with SyMach Paint booth systems designed and built in Italy, customer area, and car wash bay.

Tulsa Hills: Site Demo, ground construction of a 2 story 20,000 SF structural steel building with state of the art SyMach Paint booth systems designed and built in Italy, a 2 story material lift for parts storage, customer area, and car wash bay.

Tulsa, Memorial: Remodel of existing building, reused 10,000 SF of existing space and added 12,000 SF of new space with SyMach Paint booth systems designed and built in Italy, customer area, and car wash bay.

Yukon: Public utility extensions, ground up construction of a 2 story 20,000 SF structural steel building with 2 new Global Finishing System paint booths, a 2-story parts lift for storage, customer area, and car wash bay.

Broken Arrow: Demolition of the existing 4 building that made up Jimmy Houston Marine, construction of a 16,000 SF pre-engineered metal building, and 2 new Global Finishing System paint booths.

  • Location: Oklahoma City, Yukon, Broken Arrow & Tulsa, OK
  • Owner: Jake Nossaman
  • Architect: Rad Collaborative, Mass Architects, Integrated Architecture
  • Services: Construction Management